The Nordex Group has unveiled its new N193/7.X wind turbine at WindEnergy Hamburg, featuring a rotor diameter of 193 metres and a capacity of up to 7.3 MW. For the German market, the turbine will initially be offered with a maximum capacity of 6.6 MW. Series production is scheduled to start in 2029.
Nordex is developing its turbines in two directions: higher rated capacities and larger rotor diameters. After the N175/6.X was expanded in April 2026 to include a 7.3 MW operating mode, the N193/7.X now follows as a variant in the same capacity class, with a larger rotor for sites with medium and low wind speeds.

















