
Vienna’s VIECON congress and exhibition venue has commissioned a 2.32 MWp rooftop photovoltaic installation designed to supply more than a quarter of its annual electricity needs.
The system entered operation on 1 October and comprises 5,100 modules covering 10,200 square metres. Expected annual generation is approximately 2,347 MWh, with around 80% of output intended for direct use at the venue and the remainder exported to the grid.
The €1.9 million project was built between March and September 2026. KWI Engineers handled planning and construction supervision, while Wiener Infrastruktur Projekt managed delivery. Messe Besitz financed the installation.
VIECON said the development strengthens energy-efficient operations and its competitiveness in an international events market where organisers increasingly expect measurable sustainability improvements.
The venue used the newly generated electricity during the EURETINA 2026 congress at the beginning of October.
Generation and emissions-saving figures are estimates based on modelling rather than measured annual performance. Actual output will depend on weather and equipment efficiency. The installation demonstrates how large urban event-venue roofs can support on-site renewable generation without requiring a separate ground-mounted site.
VIECON rooftop solar installation. Image: VIECON / FRB Media.





